Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(04), 339-55.

Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(04), 273-94.

Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: a study in use. Construction Management and Economics, 6(04), 307-37.

Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(04), 357-70.

  • Type: Journal Article
  • Keywords: estimating; tendering
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446198800000028
  • Abstract:

    This paper is a statistical analysis of the distribution of tenders and how it can be derived from the distribution of estimators’ cost rates. It derives equations to explain the distribution of unit and elemental rates which are found to depend on the contribution of the task to the total cost, labour content and procurement method. It further demonstrates that while there is considerable co-variance between unit rates, there is no such interdependence between either elemental or sub-contractor rates. This means that the central limit theorem can be used to forecast the distribution of tenders.

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(04), 261-72.

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(04), 295-306.